Skip to main content

General

Are you ready to Shift into Winter?

The annual Shift into Winter campaign, which begins October 1, aims to reduce this risk by reminding British Columbians to prepare now and plan ahead for winter driving. As a member of the Winter Driving Safety Alliance, Dawson Construction encourages you and your

Highway 3 paving project complete

After two months of hard work in the thick of summer heat, Dawson Construction has laid their final piece of asphalt on another significant highway project. Highway 3 from Hope Slide to the Crowley Pit was already old and worn down before the atmospheric river spilled its ban

Len Leeuw found parts to keep projects going for three decades

Machines break down. Tools needs replacing. Shops need a random array of things to keep them running smoothly and efficiently. Someone needs to be the one to get others the parts they need for the jobs and for 33 years, that was Len Leeuw. “I loved that job. If I wasn’t t

Roger Abbott’s planning led to several significant Dawson Construction accomplishments

Before any material gets laid or moved, or any equipment gets fired up for a job, the estimator needs to meticulously map out every step and every dollar for each project. For 16 years with Dawson Construction, Roger Abbott was one of the best in B.C. at doing so. “I loved